Serian Roundabout -Pantu Junction (SPJ)

  • CH 0+050_SERIAN 1 INTERCHANGE – CONCRETING OF 1M ø BORE PILE
  • CH 2+900 LHS_PIER 5 BTG. SADONG - INSTALLATION OF 700MM ø STEEL CASING
  • CH 3+600_G25 BEAM GIRDER – SPRAYING OF CURING COMPOUND
  • CH 13+000_Slope Stabilization - Gunting works
  • CH 20+900_SUBBASE WORKS
  • CH 49+200 RHS_SABAL FOREST – EARTH CUTTING
  • CH 55+125 RHS_CONCRETING OF BENCH DRAIN
  • CH 64+600 RHS_EMBANKMENT A SG PULOH – CUTTING-OFF 150MM SQUARE PILES
  • CH 73+900 RHS_GROUND TREATMENT – LAYING OF DCR
Location Serian Roundabout to Pantu Junction
Scope Of Work Construction, Planning

Project Details

Serian Roundabout – Pantu Junction (SPJ)

WPC 03
Road Length:  75.015 km
Work will be carried out in 2 sections – Serian Section, Pantu Section
Interchanges: 3 (Serian 1, Serian 2, Simunjan)
Layby: 1 (Balai Ringin)
Bridges: 10
Bus Shelters: 84
Pedestrian Bridges: 8
Launched: March 2016
Contractor: ZECON KIMLUN Consortium Sdn. Bhd.