Serian Roundabout -Pantu Junction (SPJ)

  • BTG SADONG BRIDGE (CH 2+800)
  • Pantu sect CH48+175 - CH48+225 LHS - Laying of binder course
  • Pantu sect CH52+100 - CH52+400 RHS -Laying of roadbase
  • SERIAN 1 INTERCHANGE (CH 0+100)
  • SERIAN 2 INTERCHANGE (CH 2+400)
  • Serian sect CH0+600 LHS - Rebar works for roadside drain
  • Serian sect CH16+000 LHS - Preparation of subgrade layer
  • SG. BEDUP BRIDGE (CH 14+900)
  • SG. ENSEBANG BRIDGE (CH 36+700)
  • SG. KERAIT BRIDGE (CH 19+700)
  • Sg. Kerait Bridge B – Laying of subbase at embankment B
  • SG. KERANG BRIDGE (CH 22+120)
  • SG. PULOH BRIDGE (CH 64+585)
  • SG. SABAL APING BRIDGE (CH 53+150)
  • SG. SABAL KERUIN BRIDGE (CH 58+850)
  • SG. SABAL TENGAH BRIDGE (CH 56+125)
  • SG. SANJAU BRIDGE (CH 62+875)
  • SG. STABAU BRIDGE (CH 45+800)
  • Sg. Stabu bridge A – Casting of slab at embankment B
  • SIMUNJAN INTERCHANGE (CH 48+200)
Location Serian Roundabout to Pantu Junction
Scope Of Work Construction, Planning

Project Details

Serian Roundabout – Pantu Junction (SPJ)

WPC 03
Road Length:  75.015 km
Work will be carried out in 2 sections – Serian Section, Pantu Section
Interchanges: 3 (Serian 1, Serian 2, Simunjan)
Layby: 1 (Balai Ringin)
Bridges: 10
Bus Shelters: 84
Pedestrian Bridges: 8
Launched: March 2016
Contractor: ZECON KIMLUN Consortium Sdn. Bhd.

Address: Sublot No. 8, Lot 374, Serian Town District, 94700 Serian. Sarawak