Sg. Kua Bridge – Sg. Arip Bridge (SKB)

  • CH2+000 LHS- Concreting for drainage (cascade drain) (Selangau Section)
  • CH2+750 LHS- Installation of PVD on soft ground treatment area (Selangau Section)
  • CH6+165 LHS- Concreting for base slab at culvert 21 LHS in progress (Selangau Section)
  • CH10+900 RHS- Cutting of slope for 3rd bench (Selangau Section)
  • CH11+100 to CH11+200 LHS- Cutting of slope for 5th bench in progress (Selangau Section)
  • CH56+175 LHS- Embankment filling works in progress (Balingian Section)
  • CH60+000- Cutting slope to CH60+500 RHS (Balingian Section)
  • CH62+192 LHS- Rebar for base slab installation in progress at CB 23 RHS (Balingian Section)
  • CH62+192 LHS- Rebar for base slab installation in progress at CB 23 RHS (Balingian Section)
Location Sg. Kua Bridge to Sg. Arip (SKB)
Scope Of Work Construction, Planning

Project Details

WPC 08

Road Length:  63.678 km
Work will be carried out in 2 sections:  Selangau Section & Balingian Section
Interchanges: 1 (Selangau)
Rest & Service Area: 1 (Sg. Basai)

Bridges: 14
Bus Shelters: 50
Pedestrian Bridges: 3
Contractor: Musyati Mudajaya JV Sdn. Bhd.