Sg. Awik Bridge – Bintangor Junction (SAB)

  • Bkt sebangkoi sect Sg. Seblak Bridge - Aerial view towards Sg. Seblak Bridge
  • Bkt sebangkoi sect CH0+250 - to Ch 0+500 - Final subgrade preparation
  • Bkt sebangkoi sect CH17+500 - to Ch17+800 LHS - Laying of final layer road base
  • Bkt sebangkoi Sg.Sebetan Bridge - Aerial view towards Sg. Sebetan Bridge
  • Sarikei flyover
  • Sarikei sect Bintangor Interchange
  • Sarikei sect Sg. Nyelong Bridge - Aerial view towards Sg. Nyelong Bridge
  • Sarikei sect Sg. Paoh Bridge - Aerial view towards Sg. Paoh Bridge
  • Sarikei sect Sg.Sarikei Bridge - Aerial view towards Sg. Sarikei Bridge
Location Sg. Awik to Bintangor Junction (SAB)
Scope Of Work Construction, Planning

Project Details

WPC 06

Road Length:  64.486 km
Work will be carried out in 2 sections: Bukit Sebangkoi Section & Sarikei Section
Interchanges: 2 (Sarikei, Bintangor)
Layby: 1 (Roban)

Bridges: 6
Bus Shelters: 59
Pedestrian Bridges: 5
Contractor: PPESW BPSB JV Sdn. Bhd.

Address: No 12A 1st Floor, Lorong Nenas 1, Jalan Nenas, 96100, Sarikei, Sarawak