Sg. Awik Bridge – Bintangor Junction (SAB)

  • Aerial view of Sarikei Flyover
  • Aerial view of Sg. Paoh Bridge
  • Aerial view of Sg. Sarikei Bridge
  • Aerial view of Sg. Sebetan Bridge
  • Aerial view of Sg. Seblak Bridge
  • Bkt Sebangkoi CH1+300 -Subgrade formation (status) & median drain construction
  • Bkt Sebangkoi CH5+400 -Road base – completed
  • Bkt Sebangkoi CH7+500 -Removal of existing pavement & forming subgrade level
  • Bkt Sebangkoi CH9+000 -Binder course – completed
  • Bkt Sebangkoi CH21+200 -Final subgrade (status)
  • Bkt Sebangkoi CH28+350 -Laying 1st layer of subbase
  • Bkt Sebangkoi CH31+875 - Aerial view of Geogrid Reinforced Soil (GRS)
  • Bkt Sebangkoi Sg Sebetan -Laying final layer of road base to Sg. Sebetan bridge A approach
  • Sarikei sect CH37+400 - Final subgrade preparation
  • Sarikei sect CH41+450 - Laying final layer of binder course
Location Sg. Awik to Bintangor Junction (SAB)
Scope Of Work Construction, Planning

Project Details

WPC 06

Road Length:  64.486 km
Work will be carried out in 2 sections: Bukit Sebangkoi Section & Sarikei Section
Interchanges: 2 (Sarikei, Bintangor)
Layby: 1 (Roban)

Bridges: 6
Bus Shelters: 59
Pedestrian Bridges: 5
Contractor: PPESW BPSB JV Sdn. Bhd.

Address: No 12A 1st Floor, Lorong Nenas 1, Jalan Nenas, 96100, Sarikei, Sarawak