Pantu Junction – Btg. Skrang (PJS)

  • ABC at Approach A at Sg. Merah Bridge.
  • CH5+077 - Box Culvert C12 (Stage 1) installation of precast culvert in progress.
  • CH12+300-Slope cutting works.
  • CH16+813 - Granular backfilling stage 1 construction of C11 culvert.
  • CH68+527 - Construction of Pipe Culvert C136 in progress.
  • CH73+580 - Rebar installation for Abutment A at Btg. Lupar.
  • CH73+700 - Btg Lupar Pier 2 strutting works in progress.
  • CH80+25 - Construction of Box Culvert C14 (rebar and formworks).
  • Sri Aman Interchange - Piling work for PE Slab Pier 3 at Interchange.
Location Pantu Junction to Batang Skrang (PJS)
Scope Of Work Construction, Planning

Project Details

WPC 04

Road Length:  89.439 km
Work will be carried out in 2 sections – Bukit Begunan Section & Sri Aman Section
Interchanges: 1 (Sri Aman)
Rest & Service Area: 1 (Jelukong)
Bridges: 9
Bus Shelters: 49
Pedestrian Bridges: 3
Contractor: Naim Gamuda (NAGA) JV Sdn. Bhd

Address: Lot 921, 922 & 923, Block 8, Klauh Land District, Serian-Sri Aman Road, 95000 Sri Aman. Sarawak